Amaltas

PRECISION SOURCING / EST. 1991

OUR PROCESS

How we

build it.

Six steps. One system. From the first sketch to the shipping container — every stage is owned, watched, and signed off by us.

COMPLIANCE

Certified at

every level.

Global compliance isn’t aspirational. It’s operational. Every partner in our network holds active certifications.

GOTS

GLOBAL ORGANIC TEXTILE STANDARD

Certified organic fibre processing — from harvesting through manufacturing, labelling, and trading.

SEDEX

SUPPLIER ETHICAL DATA EXCHANGE

Independent social audits across labour standards, health & safety, environment, and business ethics.

FAMA

FACTORY AUDIT & MERCHANT ASSURANCE

Retailer-mandated factory compliance audits ensuring quality systems and ethical production standards.

OEKO-TEX

STANDARD 100

Testing for harmful substances at every stage of production — yarn, fabric, and finished garment.

SA8000

SOCIAL ACCOUNTABILITY

International standard for decent working conditions — child labour, forced labour, discrimination, and disciplinary practices.

WRAP

WORLDWIDE RESPONSIBLE ACCREDITED PRODUCTION

Independent certification of lawful, humane, and ethical manufacturing practices.

01

Product Development

You send the design intent, references, or target brief. We turn it into a production-ready tech pack with specs, BOM, construction details, and fit blocks.

Fabric, trims, and compliance are locked in early so it actually holds up in sampling and at scale. No guesswork later.

– WE SHAPE IT

02

Costing Strategy

We reverse-engineer styles to strengthen margins. We suggest smarter fabrics, construction adjustments, and detail refinements.

– WE COST IT

03

Factory Mapping

We match your programme with factories based on capability, capacity, and ways of working.
– WE MATCH IT

04

Sampling and Quality

We are your watchdogs on the ground. We pre-empt manufacturing risks that lead to major production setbacks, whether it’s a red dye known to bleed, or a construction detail that won’t hold at scale.
– WE CHECK IT

05

Production Oversight

Once production starts, we watch it closely – every milestone to ensure quality and production at scale.
– WE WATCH IT

06

Logistics and Dispatch

Lead times typically range from 45–120 days. FOB, CNF, and DDP shipments supported, with advance, LC, and consolidation handling aligned to your requirements.
– WE SHIP IT

— START A PROGRAMME.

Bring us a brief.

We'll build the rest.

Ready to source?

Your Target Price.

Our Starting Point.

Every sourcing, design and engineering decision begins with your target price.